Manufacturing: SOP

Shift Handover SOP

Use this when: Problems get lost between shifts, and each new shift starts by asking what happened.

Download as a text file

Owner: [shift supervisor]

Before the end of the shift:
1. Record output against plan for each line.
2. List downtime: what, when, how long, and the status.
3. Note quality holds, with batch or lot numbers.
4. Note safety issues and near misses.
5. List maintenance requests and open work.
6. Note material shortages and anything waiting on someone.

At handover, face to face at the line:
7. Walk through the top three priorities for the next shift.
8. Show any machine or product on hold, and confirm it's clearly tagged.
9. Both supervisors sign the log.

Afterward:
10. The manager reviews logs daily and acts on repeat issues.

Before you use this: Safety lockouts and quality holds must follow your own procedures and workplace safety rules.

Fill in the items in square brackets and adapt this to your business. It's a starting point, not legal or professional advice.

More for manufacturing

Lapsed Customer Reorder Call Script

A customer who used to order regularly has gone quiet.

Call script.

AI Prompt to Extract Data from Supplier Documents

You need key fields from supplier quotes or specs, for a person to verify.

AI prompt.

More sops

New Listing Launch SOP

A listing agreement is signed and you need every launch to happen the same way.

Real estate. SOP.

RFI Logging and Tracking SOP

Questions to the design team are getting lost, or nobody can say which ones are still open.

Construction. SOP.

Service Call Close-Out SOP for Technicians

Job notes, photos and follow-ups vary from one technician to the next.

HVAC and home services. SOP.

Check your key numbers with the Operator ScorecardSAZ's manufacturing practice